Changes between Version 2 and Version 3 of ~archive/GraphicBible
- Timestamp:
- Apr 15, 2017, 2:44:55 PM (8 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
~archive/GraphicBible
v2 v3 1 1 = Graphic Bible = 2 [[TracNav(TracNav/TOCCP)]]3 2 4 3 Once the design itself is over, it is time to move to pre-production. In this step, the designer's job is to work with the producer, the lead artist and the lead programmer to ensure that the project plan being developed will support his vision for the product.